Historic Preservation in Waitangi
Chilltech implements custom maintenance procedures for Waitangi's museums, preserving precious taonga with 24/7 HVAC operations and proactive inspections.
Client CORA Partnership
Location Whangarei
Start November 2024
Completed November 2024
The Whangarei ANZ Branch faced significant operational challenges when their ageing water chiller failed, leaving the Branch without a functioning air conditioning system in the peak of summer. Given the critical nature of the cooling system for the branch’s operations, a prompt replacement was necessary to minimise an already lengthy disruption. Faced with a distraught tenant the building owner contacted Chilltech to provide a solution.
To address the issue, the proposal involved replacing the old chiller with a new Carrier Aquasnap 30RB-160R chiller. This required a comprehensive approach, beginning with the disconnection and removal of the existing chiller from the chilled water system and electrical connections. An after-hours crane lift, involving a 50-tonne crane, road closure and traffic management, was necessary to safely position the new unit in place. The installation also included replacing the above roof section of pipework with new PE SDR11 electrofusion pipework, ensuring long-term reliability. To optimise system performance, new isolation valves, strainers, and associated components were also installed. Following the installation, the entire system was commissioned to ensure efficiency and optimal performance. Throughout the process ANZ Branch management and the building owner were kept up to date through regular communication and updates. While onsite water proofing issues with the Butanol plant platform and roof access hatch were also addressed providing the building owner with peace of mind moving forward.
The replacement of the chiller was completed successfully with minimal disruption to the branch’s operations, providing the Whangarei ANZ Branch with a modern, energy-efficient cooling solution with significantly improved energy efficiency. The upgraded infrastructure has enhanced overall system reliability, ensuring that the building maintains optimal comfort for its occupants. The project was completed on time and within budget, delivering lasting benefits to the client.
Replacing an aircon main chiller unit on the roof of a three-storey building is no easy task as it involved traffic control and a crane, but Chilltech accomplished it with great skill and efficiency. They completed the job on time and within budget, always keeping me in touch with progress. I have pleasure in recommending them as a very competent company.
Chilltech implements custom maintenance procedures for Waitangi's museums, preserving precious taonga with 24/7 HVAC operations and proactive inspections.
Maat Group needed support to address immediate issues and provide cost-effective, long-term solutions. Chilltech’s team conducted an assessment of each building’s HVAC systems and identified critical areas for improvement.
Transforming outdated HVAC systems into an efficient, elegant solution was the goal for our client. With creative thinking and strategic design, we delivered a bespoke HVAC system, blending into the space while optimising climate control.